Nobody Is Leading Your PQC Programme. Here Is Who Must.

Writer: Brian Couzens
Brian Couzens
2 minutes ago
13 min read
An empty chair at the head of a boardroom table, with teal lines from every other seat converging on a sealed mandate letter in front of it.

London, Washington, Canberra and Hong Kong have all set dates for post-quantum cryptography (PQC). Of the four publications compared here, only Hong Kong's names a role to run the transition. This article sets out the PQC transformation lead role: what it holds, who qualifies, who does not, the methodology it runs to, and what a board must put in writing before it spends another pound or dollar.

Name the person leading your post-quantum programme. One name, with a mandate in writing and no other job. If you reach for a team, a steering group or a job title that already has a day job, you have your answer. Nobody is leading it. You are funding activity and calling it a programme.

You are not alone in that, and it is no comfort. Research by Axiad, reported in August 2026, found that 46% of organisations have no single person responsible for leading their PQC migration. That includes the 39% who said the job is shared across a team with no single owner. A shared job is an unowned job. A steering group without a named lead cannot be held to a deadline and cannot be removed for missing one. Ask who signs the risk acceptance, who tells the supplier no, and who faces the regulator, and watch the room look at the floor.

SITG-Consulting's last article set out who should not lead PQC transformation. This one names who must. PQC transformation is led by a Senior Transformation Lead, in every case and without exception.


Four jurisdictions have set the dates. Only one names a role.

Four authorities on four continents have published timelines. None of them appoints your lead for you.

In the United Kingdom, the National Cyber Security Centre (NCSC) calls PQC migration "a mass technology change that will take a number of years". Its guidance says the work will run across more than one leadership cycle in a large organisation and will follow the pattern of any significant technology programme. It sets three target dates: objectives, discovery and an initial plan by 2028, the highest-priority migrations by 2031, and complete migration by 2035. The programme will outlive the executives who start it. That alone is a reason to put one person's name on it.

In the United States, the National Institute of Standards and Technology (NIST) says that, historically, the journey from a published standard to full integration "can take 10 to 20 years", and tells organisations to treat the migration as a current operational priority. It will deprecate quantum-vulnerable signature algorithms after 2030 and disallow them under its standards after 2035.

In Australia, the Australian Signals Directorate (ASD) recommends ceasing the use of traditional asymmetric cryptography by the end of 2030. Its milestones start soonest: a refined transition plan by the end of 2026, the transition under way by the end of 2028 and complete by the end of 2030. The first of those falls due in weeks.

In Hong Kong, the Hong Kong Monetary Authority (HKMA) launched its Quantum Preparedness Index in July 2026. The banking sector scored 2.3 out of 10, and the HKMA's aim is full sectoral readiness, a score of 10, by 2030. Its circular of the same day went to the chief executive of every institution it supervises. It recorded that around half of them have "no structured plan" for upgrading their cryptography, and it set out what the HKMA expects of them now: assess the exposure, build a cryptographic inventory, draft a transition roadmap. The letter was addressed to the chief executive. It was not addressed to the IT department.

Now read all four and look for the name of the person in charge. The UK, US and Australian publications compared here name nobody to run it. The NCSC addresses technical decision-makers and risk owners and stops. That silence is where programmes go to die, because every function in the building can read it as someone else's job.

Hong Kong has gone furthest. The framework published by the HKMA and the Hong Kong University of Science and Technology in November 2026 tells boards and senior management to "appoint one or more executive sponsors" and to establish a transition manager function. The same document says it is not a regulatory requirement. SITG-Consulting's own analysis of the HKMA toolkit found a detailed prescription with no demonstrated results.

That is the right direction and it stops short. A transition manager who maintains a roadmap is a start. A lead who runs a steering committee with the power to say No Go is the job. What follows is SITG-Consulting's position. No regulator requires it yet. They should, and SITG-Consulting has already told the world's regulators what to require: named executive accountability, independent validation and consequences when a deadline is missed.


The role

The Senior Transformation Lead is the one person accountable for delivering the enterprise PQC programme across the whole cryptographic estate. The role is full time and dedicated to the programme. It answers to an executive sponsor with board-level authority. SITG-Consulting places that sponsor with the Chief Risk Officer (CRO), though the role is not exclusive to the CRO. The lead manages the programme and is responsible for end-to-end delivery. The lead does not run the workstreams. Each workstream has its own lead, and the workstream leads report to the Senior Transformation Lead. The executive sponsor chairs the steering committee. The lead runs the committee and brings the five reserved decisions to it with a recommendation. The committee does not stand in for the lead.

The lines of authority are separate. Between gates, the lead manages the programme within the approved mandate, overrules any workstream that departs from it, and can pause a workstream when evidence is missing or agreed tolerances are breached. The committee decides whether a workstream passes a gate. Risk is accepted by the business and managed by the programme. The lead does not accept risk on the business's behalf. Independent assurance reports outside the programme, so the lead does not mark the programme's own work.


The mandate: five decisions the steering committee holds

A title without authority is a name on an organisation chart and a scapegoat in waiting. SITG-Consulting counts a missing board mandate among the thirteen mistakes that derail a PQC transition: no mandate means no owner, no funding and no leverage over suppliers. The mandate sets up the steering committee and gives it five decisions, in writing. The executive sponsor chairs it. The lead runs it, brings each decision to it with a recommendation and delivers what it decides. Between gates the lead does not wait for the committee. Without the mandate the committee holds nothing.

  • Scope. The whole cryptographic estate: software, data, products, protocols, suppliers, operational technology and archives. No function declares itself out of scope. The steering committee decides what counts as cryptography the organisation depends on, including the shadow cryptography that discovery tools cannot see.

  • Budget. A budget line of its own, controlled by the steering committee. A programme funded from the spare change of other budgets stops the day those budgets tighten.

  • Sequence. Risk sets the priority and the steering committee sets the order of work on the lead's recommendation. That order follows how long data must stay confidential and how long signatures must stay trusted. It does not follow a renewal calendar. Mosca's theorem gives the arithmetic, and the arithmetic does not negotiate.

  • Suppliers and contracts. The decision to put PQC requirements into procurement, renewals and supplier assessments. Without it the organisation keeps buying cryptographic debt with one hand while paying to remove it with the other.

  • Go/No Go. At each governance gate the steering committee decides Go or No Go on the evidence the lead puts in front of it. A workstream that wants to proceed without the evidence gets No Go. Between gates the lead can pause it before it gets that far. A steering committee that cannot say No Go is taking minutes.

Take away any one of the five and the lead is a reporter and the steering committee is an audience. The programme has a narrator and still no one in charge.


Who qualifies, and who does not

This is not a technical role. The expertise it demands is large-scale enterprise transformation: changing how an organisation funds, governs, buys and evidences change across every function at once. An IT project, however large, changes systems. This programme changes the enterprise, and the systems follow.

The requirements are short. None of them is negotiable.

  • Multi-year transformation delivery. The candidate has led a change programme of several years across an enterprise, with a budget, suppliers and a board to answer to, and can show what was delivered. A large IT project is not that record. If the candidate cannot show it, the interview is over.

  • Regulatory work. The candidate has answered to regulators and worked to binding requirements. Regulated organisations spend on what they must do and find reasons to defer what they have only been advised to do. The lead has to know which is which, and say so.

  • Legal, Compliance and Risk. The candidate has worked alongside all three as a peer and knows what each needs from the programme: Legal on supplier contracts and liability, Compliance on mapping each requirement to evidence, and Risk on putting cryptographic exposure into the register in terms the risk committee will act on. The candidate can defend the programme's management of risk under questioning from any of them.

  • Enough cryptographic literacy to challenge a specialist. The lead does not need to be a cryptographer. The lead does need to know when an answer is incomplete, and to refuse it.

  • Standing with suppliers. The candidate can tell a supplier that "on the roadmap" is not a control, and make it stick.

A technical background does not qualify a candidate, however deep it runs. A specialist qualifies only by demonstrating multi-year transformation delivery, and then leaves the specialist function to take the enterprise mandate full time. The test is the delivery record, and enthusiasm is not a record.


The first ninety days

The first ninety days show whether the programme is governed or just busy.

  • Days 1 to 30: mobilisation. The mandate letter, the budget line, the gates and the assurance arrangement are signed before day one. If they are not, there is no day one. In the first thirty days the lead names a lead for each workstream, brings every existing PQC activity under the programme and makes the first report to the risk committee.

  • Days 31 to 60: the as-is. The lead commissions discovery across the whole estate to establish the current state. A cryptographic bill of materials (CBOM) records what discovery finds. It is the record, and it is not the discovery. The discipline is set out in The Event Horizon II.

  • Days 61 to 90: priority and evidence. The lead sets data and signature lifetimes, treating harvest now, decrypt later and harvest now, forge later as equal reasons to act. The lead agrees with the sponsor what evidence counts as progress, and delivers the first board report in three columns: what is known, what is assumed, and what cannot yet be seen. A first report with nothing in the third column is fiction.


End-to-end delivery

The lead is responsible for end-to-end delivery of the programme, from the signed mandate through testing to transition into business as usual (BAU). Testing and BAU transition are the final acts, and the programme is not delivered until both are done. The workstreams are how the work is divided, and they matter far less than who answers for all of it. Each has its own lead, reporting to the Senior Transformation Lead. A typical split looks like this.

  • Data risk: which data must stay confidential, which signatures must stay trusted, and for how long. Discovery starts with the data, and the infrastructure comes second.

  • Crypto inventory: cryptographic use across applications, infrastructure, products and suppliers.

  • Architecture: where algorithm agility, protocol change and redesign are needed. Cryptographic agility is a governance discipline. Nobody can buy it as a feature.

  • Certificates and signing: certificate, code-signing and trust-chain changes.

  • Supplier assurance: PQC requirements in contracts and assessments.

  • Governance: risk management, funding, timelines and residual exposure.

  • Testing: proof that new algorithms work under production traffic, failure and recovery. Deploying PQC is not the same as proving it works.

  • BAU transition: handing the migrated estate to the teams that will run it, with the evidence, controls and ownership to keep it current. In the model this is Gate 6, Operational Handover and Assurance.

Every workstream needs protecting inside the programme. Teams already carrying operational change, such as the move to the 47-day certificate schedule, get funded time for PQC work and standards review, so that neither depends on an engineer finding a spare evening.


The methodology the lead runs to

A lead without a method is improvising with the organisation's risk. SITG-Consulting runs PQC programmes to the SITG-Consulting Cryptographic Transformation Implementation Model. The model sets the gates. The steering committee takes the Go/No Go decision at each one, and the lead brings the evidence.

The model has six levels: the Executive Board View, the Programme View, the Governance Gates, Engineering Execution, the Operating Model and Continuous Evidence. The Programme View runs in five phases: Discover, Govern, Transform, Assure and Sustain.

Six governance gates are mandatory, and they come in this order.

  1. Business Case and Executive Mandate

  2. CBOM and Risk Approval

  3. Architecture Approval

  4. Vendor and Supply Chain Readiness

  5. Go-Live and Interoperability Validation

  6. Operational Handover and Assurance

Look at what comes first. The mandate gate sits ahead of the CBOM, ahead of architecture and ahead of every supplier decision. An organisation that is buying tools without a signed mandate and a named lead has not passed the first gate, whatever it has spent. The mandate letter described above is how it gets through. The model's rule for every gate after that is five words long: "No gate progresses without evidence."

Two further published references sit under the model. The inventory discipline is the CBOM Operating Model in The Event Horizon II, linked above, which makes the Chief Risk Officer accountable for the risk of cryptographic failure. Independent assurance is conducted under the Quantum Cryptographic Assurance Standard (QCAS), SITG-Consulting's own published standard, which continues to evolve.


How a board appoints one

A board that means it puts five things in writing before the programme starts. The exposure is the board's own: SITG-Consulting has set out why quantum risk is now a fiduciary duty.

  1. The mandate letter, signed by the executive sponsor, setting up the steering committee and the five decisions it holds.

  2. The budget line, separate from the security and technology budgets.

  3. The reporting cadence to the risk committee, with the lead presenting in person.

  4. The governance gates, and the evidence required to pass each one.

  5. The independent assurance arrangement: who checks the programme's claims, on the condition that they do not report to the lead.

The fifth is the one boards skip. A programme that marks its own work passes every time. SITG-Consulting has set out why evidence must replace assumption and why a cryptographic assurance standard is now a board-level requirement.

Then the board puts plain questions to each candidate and listens for evasion.

  • Which multi-year transformation did you lead, and what did it deliver?

  • Which regulator have you answered to, and on what?

  • How would you establish the as-is across an estate you have never seen?

  • What would make you pause a workstream?

  • What will the board see in the first report, and what will it not yet see?

A candidate who answers the third question with the name of a tool has told you how the programme will fail.


When the role exists on paper only

SITG-Consulting recently remediated a bank that had handed its PQC programme to an internal technical team. That arrangement set the bank back three years. Count three years back from 2030 and see what is left.

These are the signs that a programme has a lead on paper only.

  • The lead has a title and no budget line.

  • PQC requirements are waived in supplier contracts without the steering committee's approval.

  • The lead reports through the function being changed.

  • Every report is green. Transformation fails when control erodes, and a wall of green is what erosion looks like from the boardroom.

  • A regulator asks for the cryptographic inventory and receives a scanner export.

One of these is enough. It means the organisation is paying for a programme and still carrying the whole risk.


What to do now

  1. Name the executive sponsor, and record why that person holds the risk.

  2. Write the mandate letter, setting up the steering committee and its five decisions, before recruiting anyone.

  3. Appoint a full-time, dedicated Senior Transformation Lead against the requirements above, and turn away candidates who do not meet them.

  4. Set the governance gates and the evidence for each.

  5. Commission independent assurance that does not report to the lead.

  6. Move every existing PQC activity, including in-flight technical work and supplier pilots, under the programme as workstreams.

  7. Put the first board report in the diary for day ninety.

The calendar is set on four continents. Australia expects a refined plan by the end of 2026. The UK expects objectives, discovery and an initial plan by 2028. Hong Kong and Australia are aiming at 2030. The UK's target for complete migration is 2035, and NIST disallows the old algorithms after that year. An organisation without a lead has not started the clock on any of them. It has deadlines, a budget request and nobody to hold to either.


Remember who the lead is not

  • Not the Chief Information Security Officer's side project. PQC transformation is an enterprise risk programme. Hand it to a security function and it gets the hours left over after the incident, the audit and the budget round. SITG-Consulting has set out why governance and ownership come before discovery.

  • Not an IT project manager. An IT project delivers systems to a plan. This programme changes how the enterprise funds, buys and evidences its cryptography, and no project plan covers that.

  • Not a specialist with a new title. The function being changed does not get to govern the change, and one team's inventory is not the estate.

  • Not a supplier's programme manager. A supplier defines your problem by what it sells and measures your progress by what it has invoiced. That is why PQC vendors are not the starting point, and why a supplier's roadmap is not your migration roadmap.

  • Not the holder of a two-day PQC certificate. Those certificates are credentials built to be sold. Two days teaches the vocabulary. It does not teach anyone to hold a supplier to a contract or to stand in front of a regulator with an answer.

  • Not part time. Part-time leadership produces a part-time programme, and 2030 does not move for anyone's diary, in any jurisdiction.

At the next board meeting, ask for the lead's name, the signed mandate and the evidence behind the latest Go/No Go decision. If the first gate is still ahead, ask what evidence it will require. If you cannot get straight answers, do not approve another supplier pilot.

Put a name on it.


Talk to the PQC transformation experts

SITG-Consulting is an independent PQC transformation advisory firm. We have no products to sell, no discovery tool to license and no product vendor partnerships. We tell boards what they need to hear, including when the answer is that nobody is in charge.

If your programme has no named, full-time lead today, every other decision you make about PQC is premature. Request a scoping call or write to brian.couzens@sitg-consulting.com.


About the author

Brian Couzens is CEO of SITG-Consulting, an independent advisory firm specialising in post-quantum transformation, cryptographic governance and assurance for financial services, critical infrastructure and government. Read more about SITG-Consulting or connect with Brian on LinkedIn.


Sources

Methodology

SITG-Consulting, Cryptographic Transformation Implementation Model: https://www.sitg-consulting.com/cryptographic-transformation-and-modernisation

SITG-Consulting, The Event Horizon II: The CBOM Operating Model (12 November 2026): https://www.sitg-consulting.com/post/event-horizon-ii-cbom-operating-model

SITG-Consulting, Quantum Cryptographic Assurance Standard (QCAS): https://www.sitg-consulting.com/quantum-cryptographic-assurance-standard

Comments


Need an independent assessment of your cryptographic exposure?

bottom of page